
Kingsley has been appointed as the environmental consultancy and monitoring partner for The Orchard at Ispahani Colony, a landmark residential development by ABC Real Estates Ltd. (an ABC Concern). Located in Boro Mogbazar, Dhaka, this prestigious project underscores the increasing focus on sustainable urban development in the city.
Renowned for its expertise in sustainable engineering solutions, Kingsley will ensure the project’s compliance with the Department of Environment (DoE) regulations and the Environmental Conservation Rules (ECR) 2023. This collaboration highlights the commitment of both Kingsley Engineering and ABC Real Estates Ltd. to environmentally responsible development practices.

The Orchard at Ispahani Colony: A Visionary Residential Development
Spanning 116 katha, The Orchard at Ispahani Colony is set to become one of Dhaka’s most significant residential projects. The development will feature five 14-story towers, two basement levels, and 143 modern apartments designed to meet the needs of urban families seeking premium living spaces. Additionally, the project will offer approximately 300 car parking spaces, contributing to the city’s growing infrastructure.
Given the scale and impact of this development, ensuring environmental compliance and sustainability is a top priority. Kingsley Engineering will play a pivotal role in securing the Initial Environmental Examination (IEE) approval and Environmental Site Clearance (ESC) from the DoE, ensuring adherence to national environmental standards.

Kingsley Engineering’s Comprehensive Environmental Consultancy Services
Kingsley Engineering’s scope of work for *The Orchard at Ispahani Colony* encompasses a wide range of critical environmental services, including:
- Preparation, Submission, and Approval of the Initial Environmental Examination (IEE) Report
Kingsley will develop and submit the IEE report to the DoE, addressing all environmental aspects of the project.
- Development of Key Environmental Systems
- Sewage Treatment Plant (STP) with Water Reuse Option: Designing an efficient STP to treat wastewater and enable water recycling.
- Rainwater Harvesting System (RWHS): Implementing a system to capture and utilize rainwater, reducing dependency on external water sources.
- Solid Waste Management System: Establishing a robust waste management plan to minimize environmental impact.
-Drainage System Planning: Designing an effective drainage system to manage stormwater and prevent flooding.
- Environmental Monitoring and Compliance
Kingsley will conduct regular monitoring to ensure compliance with environmental standards, including:
- Ambient air quality monitoring
- Noise level monitoring
- Surface and groundwater quality monitoring
- Public Consultation and Stakeholder Engagement
As part of regulatory requirements, Kingsley will organize public consultation meetings to engage local communities and address concerns regarding the project’s environmental impact. Feedback from these sessions will be documented and submitted to the DoE.
- Presentation at DoE for IEE Approval and Environmental Site Clearance
Kingsley will represent the project at the DoE, presenting the IEE report and addressing any queries to secure timely approvals.
- Preparation of Detailed STP Drawings and Designs
The firm will develop technical drawings, process descriptions, and design calculations for the STP and other environmental systems, ensuring alignment with international best practices and DoE standards.
- Coordination with Project Teams
Kingsley will collaborate with structural, electrical, plumbing, and architectural teams to integrate environmental systems seamlessly into the project’s master plan. The firm will also provide technical supervision during planning and implementation phases.
Ensuring Sustainability and Regulatory Compliance
Classified under the "Orange Category" as per Bangladesh’s Environmental Conservation Act 1995 and ECR 2023, *The Orchard at Ispahani Colony* is required to undergo an IEE and obtain Site Clearance from the DoE before construction commences.
Kingsley Engineering’s expertise in environmental impact assessment, wastewater treatment, and sustainable design will ensure the project not only meets regulatory requirements but also implements long-term eco-friendly solutions. The integration of water recycling, solid waste management, and rainwater harvesting will significantly reduce the project’s environmental footprint.
A Model for Sustainable Urban Development
As Dhaka continues to urbanize rapidly, the need for sustainable construction practices has never been more critical. The Orchard at Ispahani Colony exemplifies how modern residential developments can incorporate advanced environmental management systems while adhering to regulatory standards.

Kingsley Engineering is proud to contribute to this transformative project, leveraging its extensive experience in environmental consultancy and sustainable design. By ensuring efficient environmental management, the firm is not only facilitating a DoE-approved development but also promoting a greener, healthier future for Dhaka’s urban communities.
You must be logged in to post a comment.